Project Description: A 215,000 square feet middle school located in "The Highlands" subdivision. The school will consist of three grade level pods, a central cafeteria, band, choir, orchestra, theatre, career and technical education spaces, and two competition gyms. The grounds will include a small natural grass stadium with an eight-lane track, an additional grass practice area, and a dedicated CTE/theatre service yard.
Estimated Cost: $108,000,000
Estimated Completion: Summer 2027
UPDATES:
May 2025